Home » Projects » Qatar » Milestones

Milestones

Oil & Gas Industries
Year Projects
2002 Established SIEVERT in Qatar with work being carried out in all conventional NDT methods like RT, UT, MT, PT & PWHT.
2004 Sievert pioneered Crawler X – Ray Radiography in Qatar.
2005 First Offshore Pipeline work started with Crawler Radiography & Completed 220 KMS.
2006 X – Ray radiography for SLUG CATHCHER LINE. (For RGX and Barzan)
2007 Introduced full-fledged Advanced NDE techniques in the organization.
2008 Successful Completion of PAUT on CRA Clad Piping Welds for Rasgas through Dodsal
2010 Sievert was awarded with Qatar Petroleum offshore contract GC091074D0 Inspection and NDT & Radiography Services at QP Offshore Locations for Three Years.
2011 AHS Scanner for Tube – To – Tube Sheet weld in Heat Exchanger and COBRA SCANNER (Phased Array UT) for TUBULAR weld Inspection.
2012 Sievert was awarded with NDT Services for major EPC Contracts (Nasser S. Al Hajri/ Descon Engineering / CB & I/ Qatar Construction Co.) on Barzan Onshore Gas Plant Project in Raslaffan.
2013 Compter Radiography with gamma source for in-service inspection.
2014 Sievert was awarded with Qatar Petroleum offshore contract GC131040A0 Inspection and NDT & Radiography Services at QP Offshore Locations for Five Years.
2014 Sievert awarded 3 Years contract by Qatar Shell GTL - UI 31985 Provision of Inspection Services for static Equipment, Pipelines and structures both Onshore and Offshore
2014 Sievert Qatar completed 1800 Kms of crawler X –Ray Radiography, covering 90% of total onshore pipelines projects in Qatar till date
2015 2016 Phased Array UT used on 9% Ni LNG Tank project at yamal LNG, Russuia. There 4 nos Tanks (Tank Capacity: 160 000 m3 each) and 3145m weld length per tank.
2017 SCAR with Computer radiography continuous work at O & G plant.
2017 Fitness for Services (FFS) and Remaining Life Assessment (RLA) project at QVC
2017 Sievert awarded 5 Years contract by Qatar Shell GTL - UI 73137 Provision of Inspection Services for static Equipment, Pipelines and structures both Onshore and Offshore
2018 Major Turnaround NDT and Advanced NDT works at QP Refinery for big units’ shutdown. Deployed 200+ technical man power and successful on time completion without any safety issue.
2018 ACFM & PEC Successful implementation in our service for various projects.
2018 Sievert with BV awarded with Qatargas - LTC/C/ENG/2505-A/16 Provision of Inspection Services with Equipment contract